Transmission Line Design

Transmission Line Design involves route selection, reconnaissance survey, earth resistivity test, preliminary survey etc.

Selection Of Route

The route of a transmission line is decided from the following main considerations.

Reconnaissance Survey

It is carried out for deciding upon the most economical line route and the most economical location of towers in view of the high cost per location.

Preliminary Survey

Supreme provide the full range of services related to the planning, design and construction management of HV and EHV power transmission systems, as well as with medium and low voltage distribution networks. The projects cover the full range of activities, including studies, engineering, manufacturing, supply, works supervision and commissioning of the completed installation. Training in these fields as well as in network maintenance and operations is also available.

We have carried out studies, detailed engineering, manufactured & supplied several thousand tones of transmission structures up to 400 kV. Our esteemed list of client contains, Ceylon Electricity Board (Sri Lanka), Power Holding Company of Nigeria PLC, Electricity Company of Ghana Ltd., Ministry of Energy and Water (MEW, Afghanistan), Bangladesh Power Development Board, Nepal Electricity Authority, Transmission Corporation of Andhra Pradesh Ltd (APTRANSCO).

Certified

Magna aliqa enim sed ipsum nisi ainy veniam quis.

Construction policy

Magna aliqa enim sed ipsum nisi ainy veniam quis.

Protect your life

Magna aliqa enim sed ipsum nisi ainy veniam quis.

Construction
Web Designer 82%
Success rates
Web Designer 95%

Get In Touch